Dyson Link Bridge

Project Scope
Structural Glass Bride
Structural steel works
Architectural metalwork
Design and structural calculations
client
Client: Imperial College London
architect
Architect: Penwarden Hale Architects
contractor
Contractor: Russell Cawberry Ltd Engineer: Iain Wright Associates
address
Address: Dyson Link Bridge, Imperial College London
Key Challenges
CComplex and logistically difficult installation methodology
Totally bespoke glass and steel design – no proprietary products
Heatsoked tested, toughened laminated panels
Units structurally bonded to stainless steel frame using 'Dow Corning' structural two part silicone.
Low maintaince.
012_imperial_link_br
012_imperial_link_br
The Brief
Working with the architects on the planning stage, Glass Structures Limited submitted a pc sum to the client for the works need to then where we were appointed to the project and work with the architect to come up with some provisional design.
Our
Approach
Having provided full structural calculation for the design, Glass Structures Limited attended a site meeting to undertake a 3D survey. Working from drawing everything was put in production to allow the contactor to procced with all surrounding building works. As all of the ‘stand-off’ fittings factory welded the tolerances was minimal. After apply the purpose made Satin stainless Steel (316) sider fittings the team moved onto the glazing.

Having craned the glass onto the roof area; our fully trained NVQ level 2 in structural glazing operatives had to manoeuvre the panes into position via the City Crane carefully into position.

After applying the weather seal silicone; it was time for the ‘Ritec clearsheild coating to the external faces of the whole glass bridge, this is an invisible liquid that makes the cleaning and maintenance of the new roof so much easier,
Having an extremely tight deadline our amazing team had this installed in one week in order for the main contactor to remove the scaffolding and finish to works to get the area of the college open again.

001_imperial_link_br
002_imperial_link_br
003_imperial_link_br
004_imperial_link_br
005_imperial_link_br
006_imperial_link_br
007_imperial_link_br
008_imperial_link_br
010_imperial_link_br
011_imperial_link_br
015_imperial_link_br
017_imperial_link_br
018_imperial_link_br
019_imperial_link_br
021_imperial_link_br
022_imperial_link_br
023_imperial_link_br
024_imperial_link_br
026_imperial_link_br
027_imperial_link_br
028_imperial_link_br
029_imperial_link_br
The Result
Now fully complete, the project looks highly impressive and have made the clients & Architects vision a reality.

Providing a fabulous new glass link bridge walkway to connect up and enjoy the views across campus at the same time.
The use of the glazing allows natural light to flood the building enhancing productivity within the college. With the right preparation, planning and design; we were able to achieve perfection.