Having craned the glass onto the roof area; our fully trained NVQ level 2 in structural glazing operatives had to manually manoeuvre the units into position.
They then proceeded to structurally bond the units to the stainless-steel frame using ‘Dow Corning’ 993 structural two-part silicone.
Having an extremely tight deadline our amazing team had this installed in one weekend in order for the main contactor to remove the scaffolding and temporary roofing.
The use of the glazing allows natural light to flood the building enhancing productivity within the offices. With the right preparation, planning and design; we were able to achieve perfection.