New Cavendish Street

Project Scope
Structural Roof Glazing
Frameless Structural Canopy
client
Client: Leyton
address
Address: New Cavendish Street, LONDON
Key Challenges
Complex and logistically difficult installation methodology
Totally bespoke glass and steel design – no proprietary products
Extremely challenging programme dates
Double glazed solar control panels
Units structurally bonded to stainless steel frame using 'Dow Corning' 993 structural two part silicone
92
92
The Brief
Working with the architect at planning stage, Glass Structures Limited submitted a pc sum to the client for the required works. We were appointed to the project and worked with the architect to come up with some provisional designs.
Our
Approach
Glass Structures Limited attended a site meeting to undertake a 3D survey. Then proceeding to do the drawings in 3D to ensure that the design would work. Having provided full structural calculations, we proceeded to manufacture.

Having craned the glass onto the roof area; our fully trained NVQ level 2 in structural glazing operatives had to manually manoeuvre the units into position.
They then proceeded to structurally bond the units to the stainless-steel frame using ‘Dow Corning’ 993 structural two-part silicone.
Having an extremely tight deadline our amazing team had this installed in one weekend in order for the main contactor to remove the scaffolding and temporary roofing.

IMG_3899
IMG_3900
IMG_8322
IMG_8329
IMG_8331
The Result
Now fully complete, the project looks highly impressive and have made the clients & Architects vision a reality.

The use of the glazing allows natural light to flood the building enhancing productivity within the offices. With the right preparation, planning and design; we were able to achieve perfection.