After completion of design with the architects, we ran through the calculations with our structural engineer ensuring everything designed was fit for purpose. We designed a "tin hat" scaffold over the
glass roof incorporating an automatic hoist in able to lift the roof panels up through the atrium and outside the building by manoeuvring the panels through their own openings and lowering them back into position onto our steel frame. The panels are secured by our 'Dow Corning' two-part structural silicone.